Dallas, Texas — 2018
Low Clearance Air Handler Installation
Dallas, TX – MEI was hired by a mechanical contractor to install air handler units onto a low clearance mezzanine in the Irving Convention Center.
Using the lifting points furnished by the manufacturer, MEI’s team created a lift plan for the customer. Once approved, MEI hung two I-beams on the ceiling to suspend a 1-ton trolley and electric chain hoist from each beam.
The lifts were successful and the customer was very pleased.
Project Facts
- Dimensions: Each air handler weighs 3200 lbs., and measure 4′ X 8′ X 8′.